New Second Track on the Main Line LIRR Ronkonkoma Branch (Phase II)

With the single track along the 18 mile stretch between Ronkonkoma and Farmingdale, there is very little flexibility in the event of service disruption. The LIRR Double Track project is designed to improve service and reliability on the Ronkonkoma Branch, one of the busiest corridors of the LIRR. This project involves the construction of an uninterrupted second track, which will reduce crowding, prevent delays and boost the economy. The total project cost was approximately $138 million.

JPCL continues to provide testing and inspection services including on-site concrete inspections, soil inspections, contaminated soil/chemical analysis, and concrete cylinder testing.